RIGGERS 9th Feb 12
Change to RSL stitch pattern on Dual Hawk Tandem. (Cleared for all).
RIGGERS 1st Oct 09 (continuation)
Changes made to Tandem Strong in Vector configuration (see RIGGERS 5th May 94) with additional changes to cutaway pad and RSL area (NOT CLEARED for general use).
RIGGERS 6th Aug 09 (& STC 6th Aug 09)
Changes made to Tandem Strong in Vector configuration (see RIGGERS 5th May 94) with additional changes to cutaway pad and RSL area (NOT CLEARED for general use).
RIGGERS 3rd Aug 06
To reposition the Strong Dual Hawk Tandem secondary drogue release handle from the right hand lift web position to the left hand lift web, as per drawings supplied. (Cleared for all).
RIGGERS 2nd Dec 99
Any Tandem Main into any Tandem Container.
RIGGERS 10th June 99
Strong Tandem system with the drogue release position as per Tandem Vector system. (NOT CLEARED for general use).
RIGGERS 5th May 94
Change made to Tandem Strong drogue release riser as per drawing supplied. (NOT CLEARED for general use).
RIGGERS 5th May 94
Protective pads sewn on to the Tandem Strong container at the side of passenger attachment points to prevent damage. (Cleared for all).